Powering Bangladesh’s Future: Story of Electricity

  Pledges Fulfilled During the Awami League led grand coalition government’s last tenure (from 2009 to 2013), all pledges made in the 2009 election manifesto were successfully implemented. In 2009, the power generation capacity of Bangladesh was 4931 MW. Within 5 years, the power generation capacity stood at 10341 MW with around 62% of th...